
Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations.
Catalog No. 04-53190045-01
Printed in U.S.A.
Form 19XR,XRV-CLT-10SS
Pg CL-1
12-16 Replaces: 19XR,XRV-CLT-9SS
INITIAL START-UP CHECKLIST
FOR 19XR, XRV HERMETIC CENTRIFUGAL LIQUID CHILLER
(Remove and use for job file.)
MACHINE INFORMATION:
DESIGN CONDITIONS:
CONTROL/OIL HEATER:
Volts
115
230
REFRIGERANT:
Type:
Charge
START-UP TO BE PERFORMED IN ACCORDANCE WITH APPROPRIATE MACHINE START-UP INSTRUCTIONS
JOB DATA REQUIRED:
1. Machine Installation Instructions . . . . . . . . . . . . . . . . . . Yes
No
2. Machine Assembly, Wiring and Piping Diagrams . . . . . . Yes
No
3. Starting Equipment Details and Wiring Diagrams . . . . . . Yes
No
4. Applicable Design Data (see above). . . . . . . . . . . . . . . . Yes
No
5. Diagrams and Instructions for Special Controls . . . . . . . Yes
No
INITIAL MACHINE PRESSURE:
NOTE: To avoid injury to personnel and damage to equipment or
property when completing the procedures listed in this start-up
checklist, use good judgment, follow safe practices and adhere to
the safety considerations/information as outlined in preceding sec-
tions of this Start-Up, Operation, and Maintenance Instructions
document.
NAME
JOB NO.
ADDRESS
MODEL
CITY
STATE
ZIP
S/N
TONS
BRINE
FLOW
RATE
TEMPERATURE
IN
TEMPERATURE
OUT
PRESSURE
DROP
PASS
SUCTION
TEMPERATURE
CONDENSER
TEMPERATURE
COOLER
******
CONDENSER
******
COMPRESSOR:
Volts
RLA
OLTA
STARTER:
Mfg
Type
S/N
OIL PUMP:
Volts
RLA
OLTA
CARRIER OBLIGATIONS:
Assemble... . . . . . . . . . . . . . . . .
Yes
No
Leak Test . . . . . . . . . . . . . . . . . . . Yes
No
Dehydrate . . . . . . . . . . . . . . . . . . Yes
No
Charging . . . . . . . . . . . . . . . . . . . Yes
No
Operating Instructions
Hrs.
YES
NO
Was Machine Tight?
If Not, Were Leaks Corrected?
Was Machine Dehydrated After Repairs?
Содержание AquaEdge 19XR series
Страница 69: ...69 Fig 33 19XR Leak Test Procedures a19 1625 ...
Страница 150: ...150 Fig 62 PIC II Control Panel Wiring Schematic Frame 2 3 4 and E Compressors without Split Ring Diffuser a19 1870 ...
Страница 152: ...152 a19 1871 Fig 63 PIC II Control Panel Wiring Schematic Frame 4 and 5 Compressors with Split Ring Diffuser ...
Страница 154: ...154 Fig 64 Benshaw Inc Wye Delta Unit Mounted Starter Wiring Schematic Low Voltage a19 1873 ...
Страница 161: ...161 Fig 69 Typical Low Voltage Variable Frequency Drive VFD Wiring Schematic 575 v ...
Страница 162: ...162 Fig 69 Typical Low Voltage Variable Frequency Drive VFD Wiring Schematic 575 v cont ...
Страница 163: ...163 Fig 69 Typical Low Voltage Variable Frequency Drive VFD Wiring Schematic 575 v cont a19 1880 ...
Страница 176: ...176 CONTINUED ON NEXT PAGE Fig 71 Typical Medium Voltage Variable Frequency Drive VFD Wiring Schematic cont a19 2064 ...
Страница 186: ...186 APPENDIX B LEAD LAG WIRING 19XR Lead Lag Schematic Series Cooler Flow a19 1655 ...
Страница 187: ...187 APPENDIX B LEAD LAG WIRING cont 19XR Lead Lag Schematic Parallel Cooler Flow a19 1717 ...