15
Calix ODC-120 Installation Guide
Proprietary Information: Not for use or disclosure except by written agreement with Calix.
© 2005 Calix. All Rights Reserved.
4.5 Preparing the Cabinet
4.5.1 If not already done, open the cabinet doors as described in Section 3., Opening And Closing The
4.5.2 Inspect the inside of the cabinet to make sure there is no damage to equipment. Check the
packing slip to make sure all components are received. If any components are damaged or not
received, contact your supervisor for further instructions.
4.5.3 A gasket is installed on the concrete pad to prevent corrosion between the concrete pad and the
cabinet mounting surfaces (Fig. 12).
— Clean all debris from the concrete pad.
— Remove the end chamber cover. Remove the rubber gasket. Place the gasket into
position on the foundation pad so that the gasket will lie underneath the bottom of the
cabinet when it is placed.
4.5.4 Close and latch the main chamber doors in preparation for cabinet placement.
4.5.5 Close and latch the AC power door. The splicing end chamber door must stay open and the wind
latch secured.
P-99708_F
(6x) O .875
4x R2.000
1
1
PEFORATED EDGE
DESIGNED TO BE
REMOVED BY END
CUSTOMER
1
44.50
43.50
42.25
3.25
.00
1.69
15.24
14.25
13.55
41.69
42.69
44.44
51.94
53.44
44.89
44.44
44.48
53.57
53.44
51.61
48.59
54.48
55.94
2.00
1.00
.00
3.88
9.13
8.63
14.00
31.50
38.25
35.75
41.63
45.50
(2x) O 2.500
O 2.500
O 2.000
O 3.000
Fig. 12 : Rubber Gasket Sections
Rubber gasket sections are placed on
each end of the concrete pad, with
the holes in the gasket sections lined
up with the conduit in the pad. Note
that the sections are separated.
Содержание ODC-120
Страница 1: ...Calix ODC 120 Installation Guide June 2005 220 00050 Rev 12...
Страница 4: ......
Страница 6: ......
Страница 44: ......