4
Installation
Logano GE615 - We reserve the right to make any changes due to technical modifications.
19
4.5
Setting up the boiler block – (when
supplied as a pre-assembled block)
z
Cut through the straps.
z
Remove pallet.
Fig 19 Boiler block on pallet
1
Securing straps
2
Pallet
Level the boiler block vertically and horizontally on the
base/silencing plinth. Use the boiler section foot wedges
provided for this purpose.
Once the boiler block is levelled, remove the transport
stay from the upper and lower hubs.
Fig 20 Removing transport stay
1
Upper hub
2
Lower hub
3
Transport stay
Warning: Danger to life
from falling loads.
z
Observe the transport information on the
data sheet (attached to boiler block) when
lifting the boiler block off the pallet.
The following pages describe the installation
of the feed pipe, sensor well and outer steam
tube. The installation steps are the same,
regardless of whether delivery is as a pre-
assembled block or in loose sections.
Содержание Logano GE615
Страница 57: ...8 Faults Logano GE615 We reserve the right to make any changes due to technical modifications 57 ...
Страница 58: ...8 Faults Logano GE615 We reserve the right to make any changes due to technical modifications 58 ...
Страница 59: ...8 Faults Logano GE615 We reserve the right to make any changes due to technical modifications 59 ...
Страница 60: ......