Start up the heating system
Logano GE615 - We reserve the right to make any changes due to technical modifications.
43
5.4
Commissioning report
z
Sign all commissioning work as completed and enter
the relevant date.
Commissioning steps
Page
Comments
(signature)
1.
Carry out pressure test on items delivered separately.
page 22
2.
Filling the heating system
page 27
3.
Check heating system for leaks
- enter fill water amount and quality in operator's log
(included with the technical documentation).
page 27
4.
Check the position of the hot gas baffles (the 16-section
boiler has no hot gas baffles)
page 41
5.
Start up the control panel
See control panel
documentation
6.
Check the flue pipe for leaks.
7.
Commission the burner
See burner documentation
8.
Check the flue gas temperature
9.
Check the flue pipe for leaks
10.
Check the soundness of the hot-gas side of the boiler
11.
Enter the fuel used in the corresponding table in the
operating instructions
12.
Provide the system user with information and hand over
all relevant technical documentation
13.
Confirm correct commissioning
Company stamp/signature/date
Tab. 12 Commissioning report
Enter the relevant fuel in the table in the
operating instructions.
Содержание Logano GE615
Страница 57: ...8 Faults Logano GE615 We reserve the right to make any changes due to technical modifications 57 ...
Страница 58: ...8 Faults Logano GE615 We reserve the right to make any changes due to technical modifications 58 ...
Страница 59: ...8 Faults Logano GE615 We reserve the right to make any changes due to technical modifications 59 ...
Страница 60: ......