4
Installation
Logano GE615 - We reserve the right to make any changes due to technical modifications.
29
4.13
Installing the burner
This section explains how to install the burner.
z
Close burner door and secure with four hexagon bolts
M16 x 140 at the positions shown.
z
Tighten hexagon bolts evenly and diagonally.
z
Cut or drill burner plate on site to match the blast tube
diameter.
z
Drill holes for fastening the boiler using the burner
connecting flange as a template.
z
Screw burner plate onto the burner door (seal with GP
packing cord; diameter 10 mm).
z
Screw the burner to the burner plate.
z
Cut out insulating rings to match the blast tube
diameter.
z
Fill the remaining gap between burner door insulation
and blast tube with the modified insulation rings.
z
Connect the sight glass blower connection to the
burner to ensure the sight glass remains clear of
deposits.
Fig 36 Installing the burner
1
Sight glass
2
Blower connection
Caution: System damage
through incorrect burner.
V
Only use burners that conform to the
technical requirements of the boiler
(
Æ
see section 2.4, page 5).
Predrilled burner plates are available on
request (optional extra).
1
2
Содержание Logano GE615
Страница 57: ...8 Faults Logano GE615 We reserve the right to make any changes due to technical modifications 57 ...
Страница 58: ...8 Faults Logano GE615 We reserve the right to make any changes due to technical modifications 58 ...
Страница 59: ...8 Faults Logano GE615 We reserve the right to make any changes due to technical modifications 59 ...
Страница 60: ......