7
Heating system inspection and maintenance
Logano GE615 - We reserve the right to make any changes due to technical modifications.
52
2 Requirements Fluid Category 4 systems (Fig. 35 see
right)
z
Control valve (stop valve) on the mains cold water sup-
ply pipe
z
Strainer
z
Verifiable Backflow Prevention Device with reduced
pressure Zone(RPZ valve assembly) incorporating a
Type BA air gap
z
Tundish
z
Control valve (stop valve) on the heating system pipe-
work
z
Open the cap of the automatic air vent by one full turn
to allow air to escape.
z
Slowly fill the heating system. Observe the pressure
gauge whilst filling.
z
Close the water tap and the boiler drain valve once the
required operating pressure has been reached.
z
Bleed the system via the radiator bleed valves.
z
Top up with water if the pressure drops as a result of
bleeding the system.
z
Take the hose off the boiler drain valve.
z
Enquire from your installer, whether you can use your
public water untreated or whether you need to treat it
before filling your system.
z
Notify your installer, if you need to regularly add top-up
water to your system.
Fig 70 Requirements Fluid Category 4 systems
Caution: System damage
through frequent topping up.
The heating system may be damaged,
depending on water quality, by corrosion or
scaling if you frequently need to top-up the
heating water.
Heating
System
Mains cold
water
Stop cock
Strainer
RPZ
Stop cock
Tundish
Heating
System
Mains cold
water
Stop cock
Strainer
RPZ
Stop cock
Tundish
Heating
System
Mains cold
water
Stop cock
Strainer
RPZ
Stop cock
Tundish
Содержание Logano GE615
Страница 57: ...8 Faults Logano GE615 We reserve the right to make any changes due to technical modifications 57 ...
Страница 58: ...8 Faults Logano GE615 We reserve the right to make any changes due to technical modifications 58 ...
Страница 59: ...8 Faults Logano GE615 We reserve the right to make any changes due to technical modifications 59 ...
Страница 60: ......