Start up the heating system
This chapter describes the commissioning of the boiler
with a control panel in the Logamatic 4000 series. The
commissioning process for the different types of control
panel is the same.
V
Complete the commissioning report during commis-
sioning (
Æ
see section 5.4, page 43).
z
A burner dirtied during building work must be cleaned
before being commissioned.
5.1
Making the heating system operational
z
Create the normal required operating pressure for
commissioning (sealed heating systems) or set the
required capacity (open heating systems).
z
Check that the hot gas baffles have been inserted
correctly.
Fig 57 Checking that hot gas baffles are seated
correctly
Caution: Boiler damage
Through contaminated combustion air.
z
Ensure adequate ventilation.
z
Do not use or store chlorinated cleaning
agents or halogenated hydrocarbons (as
contained in spray cans, solvents or
cleaning agents, paints and adhesives for
example) in the boiler room.
z
Do not operate the heat generator when
heavy dust contamination is present, e.g.
following building work inside the boiler
room.
For information on the quality of the heating
water
Æ
see section 3.2, page 8.
Caution: System damage
through temperature stresses.
Temperature stresses can cause cracks if
you fill your heating system when hot. This
will cause the boiler to leak.
z
Only fill the system when cold (the flow
temperature should be no more than
40 °C).
z
Only fill the system via a WRAS approved
method.
Содержание Logano GE615
Страница 57: ...8 Faults Logano GE615 We reserve the right to make any changes due to technical modifications 57 ...
Страница 58: ...8 Faults Logano GE615 We reserve the right to make any changes due to technical modifications 58 ...
Страница 59: ...8 Faults Logano GE615 We reserve the right to make any changes due to technical modifications 59 ...
Страница 60: ......