9
4
Installation
4.1
Checking delivery for completeness
The boiler can be delivered either as a pre-assembled
block or in loose sections.
z
After delivery, check all packaging for perfect
condition.
z
Check that the delivery is complete.
4.1.1
Delivery as a pre-assembled block
4.1.2
Delivery in loose sections
Component
Piece
Packa
ging
Boiler block
1
Pallet
Fittings
1
Case
Parts
1
Case
Casing Pack A
1
Case
Casing Pack B
1
Case
Insulation
1
Foil bag
Tab. 5
Scope of supply (pre-assembled block)
Component
Piece
Packa
ging
Front, rear, central sections with upper
flow connection and burner door
1
Pallet
Central sections (depending on boiler
size)
2 – 5
Pallet
Base unit fittings, 9 – 16
sections
1
Case
Supplementary fittings (contents
depend on the size of the boiler)
1
Case
Parts
1
Case
Casing Pack A
1
Case
Casing Pack B
1
Case
Insulation
1
Foil bag
Anchor rod set with spring packs
Tab. 6
Scope of supply (loose sections)
Содержание Logano GE615
Страница 57: ...8 Faults Logano GE615 We reserve the right to make any changes due to technical modifications 57 ...
Страница 58: ...8 Faults Logano GE615 We reserve the right to make any changes due to technical modifications 58 ...
Страница 59: ...8 Faults Logano GE615 We reserve the right to make any changes due to technical modifications 59 ...
Страница 60: ......