4
Installation
Logano GE615 - We reserve the right to make any changes due to technical modifications.
13
4.4.2
Joining the boiler block assembly
Preparation of boiler sections
z
Remove nuts and washers from the studs on the hubs
of the boiler sections before attaching the rear section
and front section.
V
Put the rear section in place and prevent from falling
over using the installation aid (
Æ
see Fig. 7 and sepa-
rate installation aid instructions).
z
File down any burrs on the hubs.
Fig 8
Deburring the hub
z
Clean the packing grooves where required using a wire
brush and cloth.
z
Clean the hub sealing faces with a rag soaked in white
spirit.
z
Evenly coat the hub sealing faces with red lead putty.
Fig 9
Coating the hub sealing faces
1
Upper hub sealing face
2
Lower hub sealing face
3
Packing groove
Caution: Risk of burning
through flammable solvents.
z
Observe the cleaning agent safety
instructions.
z
When using cleaning agents, avoid naked
flames, incandescence and sparks.
The next step involves preparing the nipples
that will eventually seal the boiler sections.
Содержание Logano GE615
Страница 57: ...8 Faults Logano GE615 We reserve the right to make any changes due to technical modifications 57 ...
Страница 58: ...8 Faults Logano GE615 We reserve the right to make any changes due to technical modifications 58 ...
Страница 59: ...8 Faults Logano GE615 We reserve the right to make any changes due to technical modifications 59 ...
Страница 60: ......