3-83
Confidential
9.20 Flushing Base / Flushing Box
(1) Remove the Flushing base.
(2) Release the hook, lift up the front end of the Flushing box, and remove the Flushing
box.
Assembling Note
When the Flushing box is replaced (without replacement of the Main
PCB ASSY), reset the flushing count as described in
Chapter 4 "1.12 Reset Purge and
Flushing Counts (Maintenance mode 80)"
.
It is also recommended that the Ink absorber box be replaced and the purge count be reset
as necessary since the purge count may approach the upper limit.
(3_061L)
Flushing base
Flushing box
Hook
Содержание DCP Series
Страница 111: ...3 3 Confidential 2 PACKING For Ink Cartridge Model 3_002L ...
Страница 112: ...3 4 Confidential For Ink Tank Model 3_002L 1 ...
Страница 119: ...3 11 Confidential 2 CIS flat cable 3_006L CIS flat cable Cable guide Cable guide Flat core ...
Страница 231: ...5 9 Confidential Print Pattern for Creating Head Calibration Data Fit this mark on the left rear of the document cover ...
Страница 234: ...5 12 Confidential Scanning Compensation Data List ...
Страница 236: ...5 14 Confidential Test Pattern ...
Страница 240: ...5 18 Confidential Configuration List ...
Страница 256: ...5 34 Confidential pfadj1 Pattern pfadj2 Pattern ...
Страница 264: ...5 42 Confidential Margin Check Pattern ...
Страница 294: ...6 3 Confidential Power supply PCB 100 V series ...
Страница 295: ...6 4 Confidential Power supply PCB 200 V series ...
Страница 309: ...App 3 8 Confidential When the following screen appears click Close to close the screen ...