3-75
Confidential
• Attach the tube clamp by aligning it to the dented part of the Tube support plate shown in
the illustration in the previous page.
• After installing the Ink refill ASSY, route the Ink supply tubes to the tube guide based on
the color order described in the previous page without overlapping. Next, set it into the
sponge and route it to the Tube support wire elbow.
• Attach the Head joint to the Head/carriage unit using the joint spring as shown below.
Make sure that all of the four Ink supply tubes are routed in front of the guide boss.
(3_053L)
Head/carriage unit
Head joint spring
Head joint
Head joint
rubber
Ink supply tubes
Upper cover
Carriage flat cable
Head joint
Head joint spring
Guide boss
Head/carriage unit
Содержание DCP Series
Страница 111: ...3 3 Confidential 2 PACKING For Ink Cartridge Model 3_002L ...
Страница 112: ...3 4 Confidential For Ink Tank Model 3_002L 1 ...
Страница 119: ...3 11 Confidential 2 CIS flat cable 3_006L CIS flat cable Cable guide Cable guide Flat core ...
Страница 231: ...5 9 Confidential Print Pattern for Creating Head Calibration Data Fit this mark on the left rear of the document cover ...
Страница 234: ...5 12 Confidential Scanning Compensation Data List ...
Страница 236: ...5 14 Confidential Test Pattern ...
Страница 240: ...5 18 Confidential Configuration List ...
Страница 256: ...5 34 Confidential pfadj1 Pattern pfadj2 Pattern ...
Страница 264: ...5 42 Confidential Margin Check Pattern ...
Страница 294: ...6 3 Confidential Power supply PCB 100 V series ...
Страница 295: ...6 4 Confidential Power supply PCB 200 V series ...
Страница 309: ...App 3 8 Confidential When the following screen appears click Close to close the screen ...