3-32
Confidential
(10) Unlock the connector on the Carriage PCB and disconnect the Head flat cable.
Note
After disconnecting the flat cable, check that each cable is not damaged at its end or
short-circuited. When connecting the flat cable, do not insert it at an angle. Lock the
connector, after confirming that the cable is not at an angle.
(11) Release the spring lock and slightly raise the Carriage PCB. Next, remove the
Carriage flat cable from the Cable guide of the Head/carriage unit (refer to the
illustration in
) and release the boss from the opening in the film (refer to the
illustration below).
(12) Take the Carriage PCB ASSY out of the Head/carriage unit and put it on the Upper
cover in front of the Head/carriage unit.
(3_026L)
Head/carriage unit
Lock spring
Carriage PCB ASSY
Head flat cable
Carriage flat cable
Remove by pulling the lock
Carriage PCB ASSY
Head/carriage unit
Upper cover
Boss
Head flat cable
Opening
Film
Connector
Содержание DCP Series
Страница 111: ...3 3 Confidential 2 PACKING For Ink Cartridge Model 3_002L ...
Страница 112: ...3 4 Confidential For Ink Tank Model 3_002L 1 ...
Страница 119: ...3 11 Confidential 2 CIS flat cable 3_006L CIS flat cable Cable guide Cable guide Flat core ...
Страница 231: ...5 9 Confidential Print Pattern for Creating Head Calibration Data Fit this mark on the left rear of the document cover ...
Страница 234: ...5 12 Confidential Scanning Compensation Data List ...
Страница 236: ...5 14 Confidential Test Pattern ...
Страница 240: ...5 18 Confidential Configuration List ...
Страница 256: ...5 34 Confidential pfadj1 Pattern pfadj2 Pattern ...
Страница 264: ...5 42 Confidential Margin Check Pattern ...
Страница 294: ...6 3 Confidential Power supply PCB 100 V series ...
Страница 295: ...6 4 Confidential Power supply PCB 200 V series ...
Страница 309: ...App 3 8 Confidential When the following screen appears click Close to close the screen ...