Installation, assembly and commissioning
for the first time
Version 1.1
Page 68 of 113
4.7.3
Laying the power cable
-
The power cable should be as short as required.
-
The length of the Pack+ and Pack- cables must not exceed the respective maximum lengths.
-
Cables of each battery (plus and minus poles) must always have the equal length.
-
Cables of a battery connected in a parallel circuit must have the equal length between the batteries.
Figure 4-17: cable lengths of the ESS system
Important: Connection of the power cable
When wiring the Bat Breaker Box (output rail), ensure that only
Pack PLUS
is connected to
Pack PLUS
potentials.
When wiring the Bat Breaker Box (output rail), ensure that only
Pack MINUS
is connected to
Pack MINUS
potentials.
RISK OF A SHORT-CIRCUIT!!!
Содержание ESS 7.0
Страница 1: ...OPERATING MANUAL ESS 7 0 ...
Страница 2: ...Version 1 1 Original operating manual ...
Страница 110: ...Annexe Version 1 1 Page 110 of 113 10 1Declaration of conformity Figure 10 1 EC Declaration of Conformity ...
Страница 111: ...Annexe Version 1 1 Page 111 of 113 10 2Warranty card Figure 10 2 warranty card ...
Страница 112: ...Annexe Version 1 1 Page 112 of 113 10 3Installation check list Figure 10 3 installation check list ...
Страница 113: ...Annexe Version 1 1 Page 113 of 113 Figure 10 4 installation check list part 2 ...