Installation, assembly and commissioning
for the first time
Version 1.1
Page 66 of 113
Figure 4-15: BAT BREAKER Box of Enwitec (example for 6 batteries and 3 inverters) with an open housing
Important:
Please refer to the installation manual of the manufacturer for additional instructions regarding installation
and operation.
Connection of the
plus pole of
inverter
(3 units)
Connection of
the minus pole of
inverter
(3 units)
Connection of the
plus poles of
batteries (6 units)
Connection of
the minus poles
of batteries (6
units)
Connection side of
inverter
Cable shoe M10
Maximum Cu cross-
section:
95 mm
2
Tightening torque:
23-28 Nm
Connection side of
battery
Cable shoe M8
Maximum Cu cross-
section:
50 mm
2
Tightening torque:
13-18 Nm
Содержание ESS 7.0
Страница 1: ...OPERATING MANUAL ESS 7 0 ...
Страница 2: ...Version 1 1 Original operating manual ...
Страница 110: ...Annexe Version 1 1 Page 110 of 113 10 1Declaration of conformity Figure 10 1 EC Declaration of Conformity ...
Страница 111: ...Annexe Version 1 1 Page 111 of 113 10 2Warranty card Figure 10 2 warranty card ...
Страница 112: ...Annexe Version 1 1 Page 112 of 113 10 3Installation check list Figure 10 3 installation check list ...
Страница 113: ...Annexe Version 1 1 Page 113 of 113 Figure 10 4 installation check list part 2 ...