Installation, assembly and commissioning
for the first time
Version 1.1
Page 49 of 113
4
Installation, assembly and commissioning for the first
time
General information
Only the experts trained by BMZ GmbH may carry out the installation, assembly and first commissioning
activities.
4.1
Installation site requirements
Installation site
The BMZ ESS 7.0 battery storage system is only intended for usage in buildings.
The battery housing has been designed for a stack of up to 3 battery storage systems.
Use the structural analysis of the building to check whether it is designed for the load of the system.
Each energy storage unit weighs approximately 95 kg. If three energy storage units are stacked on each
other, intermittent loads of a maximum of 285 kg act on the floor.
The installation site must fulfil the following requirements:
Levelled (e.g.: maximum setting range of adjusting feet)
Dry (maximum air humidity 80%)
Clean (well-swept, dust free)
Vibration-free (maximum shock 0.5 g)
No direct solar radiation
No naked flames or other ignition sources near the installation place (minimum
distance 3 m)
Adequate distance (at least 20 cm) between the battery storage system and walls
Adequate air circulation to dissipate the heat generated by the battery storage
system.
Installation site below 2000-metre altitude.
Содержание ESS 7.0
Страница 1: ...OPERATING MANUAL ESS 7 0 ...
Страница 2: ...Version 1 1 Original operating manual ...
Страница 110: ...Annexe Version 1 1 Page 110 of 113 10 1Declaration of conformity Figure 10 1 EC Declaration of Conformity ...
Страница 111: ...Annexe Version 1 1 Page 111 of 113 10 2Warranty card Figure 10 2 warranty card ...
Страница 112: ...Annexe Version 1 1 Page 112 of 113 10 3Installation check list Figure 10 3 installation check list ...
Страница 113: ...Annexe Version 1 1 Page 113 of 113 Figure 10 4 installation check list part 2 ...