Installation, assembly and commissioning
for the first time
Version 1.1
Page 51 of 113
The room temperature should be in a range from 0 °C to 25 °C, wherein 15-20 °C are optimum for a long
service life.
Operate the battery storage system only in the upright position.
Ensure that the service flap at the side (NH1 fuses) is always freely accessible.
Install the battery inverter and the battery storage system near each other. Do not lay the connecting cable
between the battery and the inverter in windings. The maximum length of this cable is 2.3 m.
Only use the provided original cable.
Do not shorten the cable arbitrarily.
Do not extend the cable arbitrarily.
Do not lay the cable in loops.
Immediate surroundings of the battery storage system
The immediate surroundings of batteries must be clean and dry. Oil contaminations, dirt or water residues
must not be found outside the battery. If contaminations are found, remove them immediately. Additional
information regarding this is given in:
VDE 0510 Part 2: 2001-12, EN 50272-2: 2001 “Safety requirements for
batteries and battery systems – part 2: stationary batteries”.
4.2
Filling the warranty card
The customer / installer must fill the warranty card carefully; it shall be valid only with a signature and the
company stamp. Send the duly filled warranty card to BMZ GmbH. The warranty card is given in the annexe
of this manual.
Guarantee and warranty claims against the manufacturer can be asserted only if the installed battery has
been registered with the manufacturer along with the filled warranty card.
4.3
Filling the installation check list
The installer must fill the installation check list carefully; it shall be valid only with a signature and the
company stamp. Send the duly filled installation check list to BMZ GmbH. The installation check list is given
in the annexe of this manual.
Guarantee and warranty claims against the manufacturer can be asserted only if the installed battery has
been registered with the manufacturer along with the filled installation check list.
Содержание ESS 7.0
Страница 1: ...OPERATING MANUAL ESS 7 0 ...
Страница 2: ...Version 1 1 Original operating manual ...
Страница 110: ...Annexe Version 1 1 Page 110 of 113 10 1Declaration of conformity Figure 10 1 EC Declaration of Conformity ...
Страница 111: ...Annexe Version 1 1 Page 111 of 113 10 2Warranty card Figure 10 2 warranty card ...
Страница 112: ...Annexe Version 1 1 Page 112 of 113 10 3Installation check list Figure 10 3 installation check list ...
Страница 113: ...Annexe Version 1 1 Page 113 of 113 Figure 10 4 installation check list part 2 ...