Installation, assembly and commissioning
for the first time
Version 1.1
Page 56 of 113
Figure 4-7: battery storage system, side view of the opened housing
Change the fuse inserts depending on the inverter to which the battery is connected.
Recommendation:
SI3.0M-11:
80 A
SI4.4M-11:
100 A
SI6.0H-11:
160 A
SI8.0H-11:
200 A
Figure 4
-
8: representation of the correctly inserted fuses
Содержание ESS 7.0
Страница 1: ...OPERATING MANUAL ESS 7 0 ...
Страница 2: ...Version 1 1 Original operating manual ...
Страница 110: ...Annexe Version 1 1 Page 110 of 113 10 1Declaration of conformity Figure 10 1 EC Declaration of Conformity ...
Страница 111: ...Annexe Version 1 1 Page 111 of 113 10 2Warranty card Figure 10 2 warranty card ...
Страница 112: ...Annexe Version 1 1 Page 112 of 113 10 3Installation check list Figure 10 3 installation check list ...
Страница 113: ...Annexe Version 1 1 Page 113 of 113 Figure 10 4 installation check list part 2 ...