Insert the housing cover in the housing and tighten the screws of the cover.
For this purpose, use 2
DIN 7985 M4x6 fillister-head screws. Fix these using a PH2 Phillips screwdriver and a
maximum tightening torque of 2.5 Nm (tolerance: +/-0.1 Nm).
Figure 4-9: battery storage system, side view
The cover may remain open during the first installation in order to switch on the battery. Close the cover after
switching on the battery
6
Execute the first commissioning process by following the specifications from the Operation section (page 94).
7
Configure the parameters of the inverter as mentioned in section 4.18 (Recommended parameters).
Ensure that the batteries are not earthed by mistake. If they are earthed, disconnect the
corresponding connection.
Check all parts for firm fitting. Re-tighten all screws and terminals.
4.5.1
Checking the connections
Check the connections as per the exact specifications in the installation check list given in the annexe.
Detailed view:
Содержание ESS 7.0
Страница 1: ...OPERATING MANUAL ESS 7 0 ...
Страница 2: ...Version 1 1 Original operating manual ...
Страница 110: ...Annexe Version 1 1 Page 110 of 113 10 1Declaration of conformity Figure 10 1 EC Declaration of Conformity ...
Страница 111: ...Annexe Version 1 1 Page 111 of 113 10 2Warranty card Figure 10 2 warranty card ...
Страница 112: ...Annexe Version 1 1 Page 112 of 113 10 3Installation check list Figure 10 3 installation check list ...
Страница 113: ...Annexe Version 1 1 Page 113 of 113 Figure 10 4 installation check list part 2 ...