Installation, assembly and commissioning
for the first time
Version 1.1
Page 79 of 113
4.13
Configuration of firmware for parallel mode
Use the BMZ service tool to configure the battery using the USB service port.
The following files must be available to configure the battery parameters:
1.
ESS30ServiceTool.exe (example: current service tool V0.0.26)
2.
System.Windows.Interactivity.dll
3.
Optional for firmware update: 31502A_V205.flash (example: current firmware V2.05)
Important:
All three files must be in the same folder.
Figure 4-28: file structure of the BMZ ESS service tool
4.13.1
Setting the master battery mode
In a group of multiple BMZ ESS 7.0 batteries connected in parallel, configure
one
battery
as a
master
.
Important:
1.
Set the “
Master
” mode and configure the battery parameters by
clicking
on “
set mode
”.
2.
In a group of multiple BMZ ESS 7.0 batteries connected in parallel,
only one battery
may be
configured as a master.
Figure 4-29: representation of configuration of the parameters of a BMZ ESS battery
3.
IMPORTANT:
Configure the parameters of the battery with the maximum voltage level and the
maximum charge status as the master battery.
Содержание ESS 7.0
Страница 1: ...OPERATING MANUAL ESS 7 0 ...
Страница 2: ...Version 1 1 Original operating manual ...
Страница 110: ...Annexe Version 1 1 Page 110 of 113 10 1Declaration of conformity Figure 10 1 EC Declaration of Conformity ...
Страница 111: ...Annexe Version 1 1 Page 111 of 113 10 2Warranty card Figure 10 2 warranty card ...
Страница 112: ...Annexe Version 1 1 Page 112 of 113 10 3Installation check list Figure 10 3 installation check list ...
Страница 113: ...Annexe Version 1 1 Page 113 of 113 Figure 10 4 installation check list part 2 ...