Transport
Version 1.1
Page 43 of 113
3
Transport
3.1
Safety instructions for transport
Target group
Safety instructions intended for the installation personnel who transport, install and put the BMZ ESS 7.0
battery storage system in operation.
Safety instructions
For transporting the battery storage system and when working on electrical devices, please follow the safety
instructions from the Safety section, page 13.
3.2
Transporting the battery storage system
Delivery of the battery storage system
Delivery
The battery storage system is packed in a mechanically robust, three-walled corrugated
paper carton and delivered.
Incoming inspection
Check for the completeness using the delivery note.
Damage
Check the delivery for damage.
Visual inspection: e.g. damaged packing, scratches, dents, paint damage, missing
components)
In case of complaints:
Is the delivery damaged during transport:
Ask the forwarding agent to acknowledge obvious transport damage in writing
and on the site.
Contact the last forwarding agent immediately.
Store the packing (for a possible inspection by the forwarding agent or for
returning the product).
Содержание ESS 7.0
Страница 1: ...OPERATING MANUAL ESS 7 0 ...
Страница 2: ...Version 1 1 Original operating manual ...
Страница 110: ...Annexe Version 1 1 Page 110 of 113 10 1Declaration of conformity Figure 10 1 EC Declaration of Conformity ...
Страница 111: ...Annexe Version 1 1 Page 111 of 113 10 2Warranty card Figure 10 2 warranty card ...
Страница 112: ...Annexe Version 1 1 Page 112 of 113 10 3Installation check list Figure 10 3 installation check list ...
Страница 113: ...Annexe Version 1 1 Page 113 of 113 Figure 10 4 installation check list part 2 ...