Installation, assembly and commissioning
for the first time
Version 1.1
Page 53 of 113
6
Use a suitable lifting device to lift the battery storage system from the pallet (e.g. workshop crane).
7
Position the battery storage system on the installation site.
Adhere to the minimum distances from walls. (See section 4.1 Requirements for the installation site)
Содержание ESS 7.0
Страница 1: ...OPERATING MANUAL ESS 7 0 ...
Страница 2: ...Version 1 1 Original operating manual ...
Страница 110: ...Annexe Version 1 1 Page 110 of 113 10 1Declaration of conformity Figure 10 1 EC Declaration of Conformity ...
Страница 111: ...Annexe Version 1 1 Page 111 of 113 10 2Warranty card Figure 10 2 warranty card ...
Страница 112: ...Annexe Version 1 1 Page 112 of 113 10 3Installation check list Figure 10 3 installation check list ...
Страница 113: ...Annexe Version 1 1 Page 113 of 113 Figure 10 4 installation check list part 2 ...