PN B10093AE
2-20
Operation
Setting Up an Elutriation Run
NOTE
At the end of the run, after disassembling the liquid and power lines, be sure to replace the black
rubber stoppers in the ports at the left side of the centrifuge door. Failure to seal these openings will
prevent proper operation of the FRS system, which will cause a diagnostic shut down during the
next run.
1.
Delay Control Knob
DELAY
ELUTRIATOR
1
Содержание Avanti J-26S XPI
Страница 4: ...PN B10093AE iv Revision History ...
Страница 12: ...xii Contents Avanti J Series Centrifuge Warranty Related Documents ...
Страница 14: ...xiv Illustrations ...
Страница 16: ...xvi Tables ...
Страница 20: ...PN B10093AE xx Introduction Multi Compliance Label ...
Страница 36: ...PN B10093AE 1 16 Description Available Rotors ...
Страница 66: ...PN B10093AE 3 10 Troubleshooting JCF Z Rotor Identification ...
Страница 82: ...PN B10093AE A 10 Preinstallation Requirements Using J2 Series Rotors in the Avanti J 26S XPI ...
Страница 86: ...PN B10093AE Warranty 2 Beckman Coulter Inc Avanti J Series Centrifuge Warranty ...
Страница 87: ......