PN B10093AE
2-19
Operation
Setting Up an Elutriation Run
2
1
Install the rotor.
2
Set up sample and buffer reservoirs and tubing lines as described in the rotor manual.
a.
Route tubing lines through the elutriator port holes at the left side of the door seal.
b.
Close the centrifuge door.
3
Press
ROTOR
.
a.
Press the
JE
soft key.
JE-5.0
appears in the
Rotor:
field.
4
Enter the remaining run parameters.
5
Press
ENTER
, then
START
.
The rotor accelerates to set speed.
6
When the rotor reaches set speed, turn on the strobe controls by pressing the strobe control
power switch.
The power switch indicator lights.
7
When the rotor speed has stabilized, look through the port in the centrifuge door and turn the
DELAY
control knob until the elutriation chamber in the rotor is synchronized with the strobe.
•
(The chamber will appear to be motionless).
•
Sample can now be injected into the lines.
•
See the elutriator rotor instruction manual for detailed instructions.
1.
Strobe Power Switch
Rotor : JE-5.0
Speed : 0 RPM = 0 x G
Time : 00:00
Temp : 25°C Max Temp : 29°C
JA
JS
JLA
JV
JE
JCF-Z
Accel : MAX Decel :
SPEED
TIME
TEMP
A/D
OPT
ROTOR
ELUTRIATOR
DELAY
1
Содержание Avanti J-26S XPI
Страница 4: ...PN B10093AE iv Revision History ...
Страница 12: ...xii Contents Avanti J Series Centrifuge Warranty Related Documents ...
Страница 14: ...xiv Illustrations ...
Страница 16: ...xvi Tables ...
Страница 20: ...PN B10093AE xx Introduction Multi Compliance Label ...
Страница 36: ...PN B10093AE 1 16 Description Available Rotors ...
Страница 66: ...PN B10093AE 3 10 Troubleshooting JCF Z Rotor Identification ...
Страница 82: ...PN B10093AE A 10 Preinstallation Requirements Using J2 Series Rotors in the Avanti J 26S XPI ...
Страница 86: ...PN B10093AE Warranty 2 Beckman Coulter Inc Avanti J Series Centrifuge Warranty ...
Страница 87: ......