PN B10093AE
2-3
Operation
Preparation
2
2
Depress the foot pedal to open the chamber door.
3
Install the rotor according to instructions in the applicable rotor manual, then firmly close the
chamber door.
4
Press
OPT
then use the keypad to enter the program number.
5
Check that all parameters are correct and that the door is closed.
a.
Press
ENTER
then press
START
.
6
Wait for program step 1 or 2 to end, or end the run by pressing
STOP.
7
When the rotor stops, depress the foot pedal to open the chamber door.
Preparation
Prepare the rotor for centrifugation as described in the rotor manual.
Installing the Rotor
The power must be turned on before you can unlock and open the chamber door.
1
Turn the power switch on (
I
).
Indicator lights on the control panel light up.
2
Step on the foot pedal to open the door.
The door opens.
3
Install the rotor according to the instructions in the rotor manual.
Make sure that the rotor is seated on the drive hub.
Содержание Avanti J-26S XPI
Страница 4: ...PN B10093AE iv Revision History ...
Страница 12: ...xii Contents Avanti J Series Centrifuge Warranty Related Documents ...
Страница 14: ...xiv Illustrations ...
Страница 16: ...xvi Tables ...
Страница 20: ...PN B10093AE xx Introduction Multi Compliance Label ...
Страница 36: ...PN B10093AE 1 16 Description Available Rotors ...
Страница 66: ...PN B10093AE 3 10 Troubleshooting JCF Z Rotor Identification ...
Страница 82: ...PN B10093AE A 10 Preinstallation Requirements Using J2 Series Rotors in the Avanti J 26S XPI ...
Страница 86: ...PN B10093AE Warranty 2 Beckman Coulter Inc Avanti J Series Centrifuge Warranty ...
Страница 87: ......