PN B10093AE
2-17
Operation
Setting Up a Zonal Run
2
1
Turn the key to the
ZONAL
position.
•
Open-door operation up to 3000 RPM is enabled.
•
JCF-Z appears in the
Rotor:
field.
2
Install the rotor.
a.
Leave the door open when installation is complete.
3
Press
ROTOR
.
a.
Press the
JCF-Z
soft key.
b.
Enter the remaining run parameters.
4
Press
ENTER,
then
START
.
•
The rotor begins accelerating to 2000 RPM, which is the default loading speed.
•
If an
2
t
run is specified,
2
t
starts accumulating.
•
To select a different loading speed, enter a speed of 3000 RPM or less before or after the
rotor starts to spin.
5
Load the rotor.
ZONAL
Accel : MAX Decel : MAX
Rotor : JCF-Z
Speed : 0 RPM = x G
Time : 00:00
Temp : 25°C Max Temp : 29°C
JCF-Z
SPEED
TIME
TEMP
A/D
OPT
ROTOR
Accel : MAX Decel : MAX
Rotor : JCF-Z
Speed : 20 000 RPM = x G
Time : 00:45
Temp : 20°C Max Temp : 24°C
SPEED
TIME
TEMP
A/D
OPT
ROTOR
JA
JS
JLA
JV
JE
JCF-Z
Содержание Avanti J-26S XPI
Страница 4: ...PN B10093AE iv Revision History ...
Страница 12: ...xii Contents Avanti J Series Centrifuge Warranty Related Documents ...
Страница 14: ...xiv Illustrations ...
Страница 16: ...xvi Tables ...
Страница 20: ...PN B10093AE xx Introduction Multi Compliance Label ...
Страница 36: ...PN B10093AE 1 16 Description Available Rotors ...
Страница 66: ...PN B10093AE 3 10 Troubleshooting JCF Z Rotor Identification ...
Страница 82: ...PN B10093AE A 10 Preinstallation Requirements Using J2 Series Rotors in the Avanti J 26S XPI ...
Страница 86: ...PN B10093AE Warranty 2 Beckman Coulter Inc Avanti J Series Centrifuge Warranty ...
Страница 87: ......