14/4798.495.002
Installation | 67
Dachs Pro 20 ST
6.8 Oil supply connection
Note:
This chapter is not relevant for the Dachs Pro 20 ST.
The fuel supply is realised exclusively using natural gas.
i
Step 5
►
Connect the gas ball valve
6
to
the transfer point to the gas supply
prepared on site.
Step 6
►
Tighten the gas hose
5
stress-relieved
between the gas ball valve
6
and the
90° bracket
4
.
Fig. 60: Gas connection installation set
Vent the gas line:
Attention:
The gas hose including the internal gas duct may only be vented under supervision.
!
►
Open the gas valve and ensure gas supply to the Dachs Pro 20 ST.
►
Vent the gas line according to TRGI 8.1.1.1.3.
►
After venting, close the vent valve at the gas fitting.
►
Finally, check the tightness by means of leak spray or a leak detection device to check the entire gas duct.
Attention:
Check whether the venting valve connection is gas tight.
!
Reference:
Please observe the instructions and information in the iav Documentation
of VW on the EcoBlue 2.0 (Generation 1.2) in particular.
Содержание Senertec Dachs Pro 20 ST
Страница 115: ...14 4798 495 002 Spare parts 115 Dachs Pro 20 ST Notes ...
Страница 116: ...14 4798 495 002 116 Spare parts Dachs Pro 20 ST Notes ...
Страница 117: ...14 4798 495 002 Spare parts 117 Dachs Pro 20 ST Notes ...
Страница 118: ...Dachs Pro 20 ST Baxi Commercial Wood Lane Erdington Birmingham B24 9QP ...