14/4798.495.002
| 5
Dachs Pro 20 ST
6.9.2 Exhaust gas line dimensioning base ........................................................................................................................................................70
6.9.3 Exhaust gas line - DN80 package ..............................................................................................................................................................71
6.9.4 Exhaust gas line - DN100 (DN80) duct mounting ...............................................................................................................................72
6.9.5 Exhaust gas line - DN100 (DN80) external wall ....................................................................................................................................73
6.10 Electrical connection............................................................................................................................................74
6.10.1 CHP grid connection (CHP unit) ................................................................................................................................................................77
6.10.2 Electrical connection of the frequency converter to the CHP ........................................................................................................78
6.10.3 Connection of the CO sensors to the CHP .............................................................................................................................................79
6.10.4 MSR Pro 20 ST grid connection ..................................................................................................................................................................79
6.10.5 Connections in the MSR Pro 20 ST ............................................................................................................................................................80
6.10.6 Dachs Pro 20 ST equipotential bonding .................................................................................................................................................86
6.10.7 Heating emergency switch connection .................................................................................................................................................87
6.11 Filling the unit .......................................................................................................................................................88
6.12 Finishing work .......................................................................................................................................................89
7 Commissioning .............................................................................................................................................90
7.1 General information .............................................................................................................................................90
7.2 Check list prior to commissioning .....................................................................................................................91
7.3 Commissioning procedure .................................................................................................................................94
7.4 Gas supply settings ..............................................................................................................................................95
7.5 Oil supply settings ................................................................................................................................................95
7.6 Commissioning settings ......................................................................................................................................95
7.6.1 Service level selection and start of MSR Pro 20 ST commissioning ..............................................................................................95
7.6.2 Menu sequence during MSR Pro 20 ST commissioning ...................................................................................................................95
7.6.4 MSR Pro 20 ST settings in menu 8/1
Date/time �������������������������������������������97
7.6.3 MSR Pro 20 ST settings in menu 1/7
Dachs data ������������������������������������������97
7.6.5 MSR Pro 20 ST settings in menu 1/8
Dachs Pro 20 ST location information ����������������97
7.6.6 MSR Pro 20 ST settings in menu 11/2
Service tel�-no� �����������������������������������98
7.6.7 MSR Pro 20 ST settings in menu 11/6/2/20
Confirm commissioning ���������������������������98
7.6.8 Advanced MSR Pro 20 ST parameter settings .......................................................................................................................................98
7.6.9 Advanced CHP parameter settings ..........................................................................................................................................................99
7.7 Finishing work .......................................................................................................................................................99
7.7.1 Commissioning protocol ..............................................................................................................................................................................99
7.7.2 Operator briefing ............................................................................................................................................................................................99
8 Operation ....................................................................................................................................................100
8.1 General information .......................................................................................................................................... 100
8.2 Control panel ...................................................................................................................................................... 100
8.2.1 MSR Pro 20 ST control panel and menu structure ............................................................................................................................100
8.2.2 CHP control panel and menu structure ................................................................................................................................................102
8.3 Start-up ................................................................................................................................................................ 103
8.4 Shutdown ............................................................................................................................................................ 103
8.5 Frost protection ................................................................................................................................................. 103
Содержание Senertec Dachs Pro 20 ST
Страница 115: ...14 4798 495 002 Spare parts 115 Dachs Pro 20 ST Notes ...
Страница 116: ...14 4798 495 002 116 Spare parts Dachs Pro 20 ST Notes ...
Страница 117: ...14 4798 495 002 Spare parts 117 Dachs Pro 20 ST Notes ...
Страница 118: ...Dachs Pro 20 ST Baxi Commercial Wood Lane Erdington Birmingham B24 9QP ...