14/4798.495.002
Commissioning | 99
Dachs Pro 20 ST
7.6.9 Advanced CHP parameter settings
The following parameters in the menu “Operating settings”
must
be checked and set at commissioning of the Dachs Pro 20
ST:
Menu 13
●
Operating mode
(automatic)
●
Unit status
(unlocked)
Menu 15
●
Temperature threshold on
(80 °C)
●
Temperature threshold off
(75°C)
●
Number of buffer sensors
(4)
●
Number of heating circuits
(0)
●
Circulation installation
(NO)
●
Drinking water storage installation
(NO)
●
Heating cartridge installation
(NO)
●
Additional oil pump operation
(automatic)
●
Primary circuit control
(mot. V3 control)
●
P1 power at mot. V3 control
(100%)
●
Confirm commissioning
(confirm)
Reference:
Please particularly observe the supplementary instructions and information to be
observed in the iav Documentation of VW on the EcoBlue 2.0 (Generation 1.2) -
in
general chapter 7 CHP controller settings. The parameters in chapters 7.5.5,
7.5.6 and 7.5.7 in particular must be adapted
.
7.7 Finishing work
7.7.1 Commissioning protocol
Note:
The commissioning protocol in the service manual of the unit must
always
be completed.
i
►
Instruct the operator regarding the safe operation of the unit.
►
Instruct all operators on how to correct simple malfunctions.
►
Inform the operator regarding the required maintenance and service work.
►
Provide the operator with all documents required.
7.7.2 Operator briefing
Содержание Senertec Dachs Pro 20 ST
Страница 115: ...14 4798 495 002 Spare parts 115 Dachs Pro 20 ST Notes ...
Страница 116: ...14 4798 495 002 116 Spare parts Dachs Pro 20 ST Notes ...
Страница 117: ...14 4798 495 002 Spare parts 117 Dachs Pro 20 ST Notes ...
Страница 118: ...Dachs Pro 20 ST Baxi Commercial Wood Lane Erdington Birmingham B24 9QP ...