3. Mechanical setup
Barco – OverView cDG67-DL – R5976624– installation manual – Revision 03 – August-2005
______________________________________________________________
3-17
chemical anchor
M10
raised floor construction
raised floor
principle drawing
concrete floor
GRD02
OverView cD80 has to be fixed to the floor by
means of stabilization corners, one attached on
each vertical profile. Usually the stabilization
corner is fixed by means of an M10 plug. In
case of false floor, the wall has to be fixed to
the concrete floor by means of thread rods,
nuts and anchors.
To increase stability, additional fixation is
advised to the ceiling and/or the wall (not
provided in the standard delivery).
Fixation to the ceiling/wall:
Every two rows and every two columns have to
be connected to the ceiling/wall. The design of
connection and its implementation is part of
the project management and customized for
each
installation.
Please
contact
the
responsible project manager!