
Installing Cable Slack Managers
Issue 3 January 2008
27
Figure 9: Cable routing through Cable Slack Manager—example for SCC1 Media Gateway
Figure notes:
1. Top of Media Gateways
2. Cable Clamps
3. Cable Ties (Optional)
4. Power Cord
5. Cable Slack Manager
6. Cable Slack Manager (Cover
Removed)
7. Main Distribution Frame (MDF)
8. Route Cables Along Path Shown
9. Port Cables
3
5
1
2
r758155 CJL 031496
4
Содержание 03-300686
Страница 1: ...Installing and Connecting the MDF and Telephones 03 300686 Issue 3 Release 5 0 January 2008 ...
Страница 8: ...Contents 8 Installing and Connecting the MDF and Telephones ...
Страница 28: ...Installing the main distribution frame 28 Installing and Connecting the MDF and Telephones ...
Страница 32: ...Installing the patch panel 32 Installing and Connecting the MDF and Telephones ...
Страница 40: ...Media gateway connections to the MDF 40 Installing and Connecting the MDF and Telephones ...
Страница 53: ...Completing a provisioning plan Issue 3 January 2008 53 Figure 25 Port Assignment Record Form ...
Страница 108: ...Installing and wiring telephones and trunks 108 Installing and Connecting the MDF and Telephones ...
Страница 134: ...Installing and wiring telephone power supplies 134 Installing and Connecting the MDF and Telephones ...
Страница 156: ...156 Installing and Connecting the MDF and Telephones Index ...