
Installing the main distribution frame
26 Installing and Connecting the MDF and Telephones
Cable clamps are required in installations with cable slack managers. At the rear of the media
gateways, install two cable clamps using the screws provided. These clamps hold the 25-pair
input/output or MDF cables in place.
Figure 8: Cable routing through Cable Slack
Manager—example for MCC1 Media Gateway
on page 26 and
Figure 9: Cable routing through
Cable Slack Manager—example for SCC1 Media Gateway
on page 27 show cable clamp
placement and cable routing.
Figure 8: Cable routing through Cable Slack Manager—example for MCC1 Media Gateway
Figure notes:
1. Top of Media Gateway
2. Cable Slack Manager
3. Cable Clamp
4. Spare Center Troughs
5. Media Gateway Trough for
Port Cables
cbdfflr CJL 102396
Содержание 03-300686
Страница 1: ...Installing and Connecting the MDF and Telephones 03 300686 Issue 3 Release 5 0 January 2008 ...
Страница 8: ...Contents 8 Installing and Connecting the MDF and Telephones ...
Страница 28: ...Installing the main distribution frame 28 Installing and Connecting the MDF and Telephones ...
Страница 32: ...Installing the patch panel 32 Installing and Connecting the MDF and Telephones ...
Страница 40: ...Media gateway connections to the MDF 40 Installing and Connecting the MDF and Telephones ...
Страница 53: ...Completing a provisioning plan Issue 3 January 2008 53 Figure 25 Port Assignment Record Form ...
Страница 108: ...Installing and wiring telephones and trunks 108 Installing and Connecting the MDF and Telephones ...
Страница 134: ...Installing and wiring telephone power supplies 134 Installing and Connecting the MDF and Telephones ...
Страница 156: ...156 Installing and Connecting the MDF and Telephones Index ...