
Testing the complete configuration
150 Installing and Connecting the MDF and Telephones
SPAN LEDs
The four SPAN LEDs indicate the status of the four T1/E1 facilities. A SPAN LED is in one of the
following states:
●
Solid on yellow: Facility is operational and alarm free.
●
Blinking yellow for 2 seconds, off 0.1 seconds: Facility is operational and alarm free AND is
carrying the control channel (facility A or B only).
●
Solid on red: Facility is alarmed.
●
Solid off: Facility is not administered or has been busied out.
solid on
DS1 Converter
active. This is the normal state for an active
DS1
Converter
.
solid off
DS1 Converter
standby. This is the normal state for a standby
DS1 Converter
in critical reliability configurations (duplicated
PNC).
Table 23: DS1 Converter yellow LED flashing states (continued)
LED on
LED off
Condition
2 of 2
Содержание 03-300686
Страница 1: ...Installing and Connecting the MDF and Telephones 03 300686 Issue 3 Release 5 0 January 2008 ...
Страница 8: ...Contents 8 Installing and Connecting the MDF and Telephones ...
Страница 28: ...Installing the main distribution frame 28 Installing and Connecting the MDF and Telephones ...
Страница 32: ...Installing the patch panel 32 Installing and Connecting the MDF and Telephones ...
Страница 40: ...Media gateway connections to the MDF 40 Installing and Connecting the MDF and Telephones ...
Страница 53: ...Completing a provisioning plan Issue 3 January 2008 53 Figure 25 Port Assignment Record Form ...
Страница 108: ...Installing and wiring telephones and trunks 108 Installing and Connecting the MDF and Telephones ...
Страница 134: ...Installing and wiring telephone power supplies 134 Installing and Connecting the MDF and Telephones ...
Страница 156: ...156 Installing and Connecting the MDF and Telephones Index ...