ASI – The leader in Advanced Systems Integration | www.asimedical.net
TRiTOn
™
ADVAnceD DenTAl SySTeMS
®
2025M | 2025M/DV | 2025M/AR
15
65-2025M Rev. B
Verify Vacuum System Maintenance
– Ensure waste tank system was purged and disinfected and that solids trap filters have
been replaced or are clean enough for operation.
Vacuum On
– Next, open the suction handpiece valves, flip the vacuum switch to on, and lift the handpiece from the holder to
activate the vacuum pump. The motor will begin to run. If it does not, turn off and verify the waste tank has been purged. The
waste tank has a float switch that will turn off the vacuum pump if the container is filled.
Verify Water System
– Check and or fill water bottles appropriately and ensure the air pressure switch is turned on and that
air pressure in the gauge reads approximately 30-35 psi.
Verify Handpiece Operation
– Handpiece instruments can be picked up and operated briefly by pressing the foot control.
Verify fiber optic illumination systems light and operation of other instruments. Water can also be sprayed from instruments to
ensure it is working correctly.