Equipment Set Up and Procedure
The above diagrams show the correct assembly of the three different arrangements of the
floor sections. Set up the laminated ramp in the flume ensuring that the flume is level.
Open the flow control valve and allow the water to enter the flume. By adjusting the
valve, the depth of water can be varied in stages. At each stage the flow pattern of the
water should be observed and noted.
The critical depth can be determined as a separate experiment if required.
Since the ramp is fabricated in three sections the above procedure can be repeated with
the different profiles.
Close the flow control valve, allow the water to drain from the flume then replace the
laminated ramp with the false floor. Repeat the above.
Close the flow control valve, allow the water to drain from the flume then replace the
false floor with the raised floor. Repeat the above
.
Содержание C4-MKII
Страница 1: ...An ISO 9001 Company INSTRUCTION MANUAL C4 MKII ISSUE 7 SEPTEMBER 2006 MULTI PURPOSE TEACHING FLUME...
Страница 2: ......
Страница 8: ......
Страница 10: ...8 1 1 Diagram 1 Inlet End of Flume 1 2 3 5 6 8 7 4...
Страница 11: ...9 1 2 Diagram 2 Discharge End of Flume 10 3 1 8 2 7 9 11...
Страница 82: ...80 Phase 2 Deflected nappe Phase 3 Depressed nappe Phase 4 Air Partialised...