71
6.14
Exercise L: Flow Over a Dam Spillway
Objective
To observe the flow patterns associated with the flow of water over a dam spillway
Method
By operating the C4-MkII flume with the dam spillway fitted, using with different shapes
of spillway toe.
Equipment Required
Armfield C4-MkII Flume
Two Hook and Point Gauges, 300mm scale
Dam spillway C4-64 with different toes (optional accessory):
Blended Reverse Curvature Toe
Ski Jump
Sloping Apron
Armfield F1-10 Hydraulics Bench
Stopwatch (for flow measurement using F1-10 volumetric tank)
Optional Equipment
Direct reading flowmeter
C4-61 Pitot tube and manometer (for velocity measurement)
Содержание C4-MKII
Страница 1: ...An ISO 9001 Company INSTRUCTION MANUAL C4 MKII ISSUE 7 SEPTEMBER 2006 MULTI PURPOSE TEACHING FLUME...
Страница 2: ......
Страница 8: ......
Страница 10: ...8 1 1 Diagram 1 Inlet End of Flume 1 2 3 5 6 8 7 4...
Страница 11: ...9 1 2 Diagram 2 Discharge End of Flume 10 3 1 8 2 7 9 11...
Страница 82: ...80 Phase 2 Deflected nappe Phase 3 Depressed nappe Phase 4 Air Partialised...