![APS CFS108 Скачать руководство пользователя страница 109](http://html1.mh-extra.com/html/aps/cfs108/cfs108_operation-manual_2956870109.webp)
CFS100 SERIES OPERATION MANUAL
SECTION 7: REMOTE PROGRAMMING
Entire Contents Copyright
2016 by Adaptive Power Systems, Inc. (APS) • All Rights Reserved • No reproduction without written authorization from APS.
APS CFS100 Series Power Source Operation Manual
Page 109 of 146
Command
Name
Description
BIT 7, 80H,(128)
Prompt
*SRE <value>
Service Request Enable
value=0~255
*SRE?
Service Request Enable
Query
0 – 255
*PSC {1|0}
Power-On Status
1 = Power-on clear enable registers
0 = Power-on load previous enable registers
*PSC?
Power-On Status Query
returns value = 0 or 1
Table 7-3: IEEE488.2 Common Commands Supported
7.7.2
*IDN?
Read the instrument identification string. Company = APT.
Example:
ADAPTIVE POWER SYSTEMS,CFS108,9991858,Version 1.00.00
7.7.3
*RST
Reset the instrument to original power on configuration. Does not clear Enable register for
Standard Summary Status or Standard Event Registers. Does not clear the output queue.
Does not clear the power-on-status-clear flag.
7.7.4
*TST?
Performs a self test of the instrument data memory. Returns 0 if it is successful or 1 if the
test fails.
7.7.5
*CLS
Clears the Status Byte summary register and event registers. Does not clear the Enable
registers.
7.7.6
*OPC / *OPC?
Instructs the instrument to sets the operation complete bit (bit 0) in the Standard Event
register, after a command is completed successfully.
The query format returns an ASCII “1” after the last command received has completed
executing.
7.7.7
*WAI
After the command is executed, it prevents the instrument from executing any further
query or commands until the no-operation-pending flag is TRUE.
Содержание CFS108
Страница 145: ......