
4.5 USB Link Sequence
4-25
4
O
per
ation
4.5.3 USB Link Sequence Start
Figure 4.5.3-1 USB Link Sequence Transmission Procedure
When [Sequence Start] is clicked, PPG is in the wait status for receiving
the LFPS signal and the button display is changed to Stop.
Connect the USB Test Fixture connector to DUT in this condition.
DUT detects the connection of the USB connector and outputs the LFPS
signal.
PPG receives the LFPS signal output from DUT at AUX Input and starts
the link training sequence.
When the link training sequence transmission is completed, the button
display is changed to Unlink and the test pattern is sent from PPG.
Start
When PPG detects the LFPS
signal, the sequence
transmission is started.
Check that the button display is
changed to [Unlink].
BER measurement
Check that the button display is
changed to [Stop] and PPG is
in the wait status for receiving
the LFPS signal.
Connect the USB Test Fixture
to DUT. In this case, DUT
detects the connection and
outputs the LFPS signal.
Select the USB3.1
Specification from Gen1 or
Gen2.
Select [Not Wait For The LFPS
Signal].
Click [Sequence Start].
Yes
No
PPG starts the sequence.
Check that the button display is
changed to [Unlink].
Содержание MX183000A
Страница 12: ...xii ...
Страница 16: ...IV ...
Страница 20: ...Chapter 1 Outline 1 4 Figure 1 1 3 Jitter Tolerance Graph Screen ...
Страница 54: ...Chapter 3 Connecting Equipment 3 16 ...
Страница 136: ...Chapter 5 Remote Control 5 30 Figure 5 8 2 Sequence Screen BER Measurement 10 8 9 11 ...
Страница 206: ...Chapter 5 Remote Control 5 100 ...
Страница 218: ...Appendix A Specifications A 12 ...
Страница 226: ...Appendix B Default Settings B 8 ...