![Amazone EDX 9000-TC Скачать руководство пользователя страница 7](http://html1.mh-extra.com/html/amazone/edx-9000-tc/edx-9000-tc_operating-manual_2919753007.webp)
Table of Contents
EDX 9000-TC BAH0048-6 09.2019
7
6.1.1.1
Data required for the calculation (hitched implement) ......................................................... 102
6.1.1.2
Calculation of the required minimum ballasting at the front G
V min
of the tractor for assurance
of the steering capability ...................................................................................................... 103
6.1.1.3
Calculation of the actual front axle load of the tractor T
V tat
................................................. 103
6.1.1.4
Calculation of the actual total weight of the combined tractor and implement .................... 103
6.1.1.5
Calculation of the actual rear axle load of the tractor T
H tat
.................................................. 103
6.1.1.6
Tyre load capacity ................................................................................................................ 103
6.1.1.7
Table .................................................................................................................................... 104
6.1.2
Requirements for tractor operation with attached implements ............................................ 105
6.1.3
Implements without their own brake system ........................................................................ 105
6.2
Securing the tractor/implement against unintentional start-up and rolling ........................... 106
6.3
Installation regulations for the hydraulic fan drive connection (singling unit) ...................... 107
7
Coupling and uncoupling the implement .............................................. 108
7.1
Dual-circuit pneumatic service brake system ...................................................................... 109
7.1.1
Coupling the brake and supply lines .................................................................................... 111
7.1.2
Uncoupling the supply and brake line .................................................................................. 113
7.1.3
Control elements of the dual-circuit pneumatic service brake system:................................ 114
7.2
Hydraulic service brake system ........................................................................................... 115
7.2.1
Coupling the hydraulic service brake system ...................................................................... 116
7.2.2
Uncoupling the hydraulic service brake system ................................................................... 118
7.3
Hydraulic hose lines ............................................................................................................. 119
7.3.1
Coupling the hydraulic hose lines ........................................................................................ 119
7.3.2
Uncoupling the hydraulic hose lines .................................................................................... 120
7.4
Coupling the implement ....................................................................................................... 120
7.5
Uncoupling the implement ................................................................................................... 125
7.6
Aligning a towed implement ................................................................................................. 128
7.7
Coupling the hydraulic pump ............................................................................................... 129
7.7.1
Connecting the hydraulic pump ........................................................................................... 129
7.7.2
Uncoupling the hydraulic pump............................................................................................ 130
8
Settings ..................................................................................................... 131
8.1
Seed metering and application ............................................................................................ 132
8.1.1
Adjusting the seeding rate ................................................................................................... 132
8.1.2
Setting the seed shutter ....................................................................................................... 132
8.1.3
Adjusting the air guide ......................................................................................................... 133
8.1.4
Setting the seed scraper ...................................................................................................... 135
8.1.5
Adjusting the seed placement depth .................................................................................... 136
8.1.6
Setting the coulter pressure ................................................................................................. 137
8.1.7
Setting the sections pressure ............................................................................................... 138
8.1.8
Adjusting the ground contact pressure and intensity of the press rollers ............................ 139
8.1.9
Adjusting the star clearers ................................................................................................... 140
8.1.10
Adjusting the clod clearers ................................................................................................... 140
8.1.11
Adjusting the carrier roller scraper ....................................................................................... 141
8.1.12
Adjusting the press roller scraper ........................................................................................ 141
8.1.13
Checking the placement depth and grain spacing ............................................................... 142
8.2
Fertiliser metering and application ....................................................................................... 143
8.2.1
Setting the fill level sensor ................................................................................................... 143
8.2.2
Installing/removing the metering roller ................................................................................. 144
8.2.3
One-sided shut-off of the fertiliser supply ............................................................................ 145
8.2.4
Setting the fertilising rate using a calibration test ................................................................ 146
8.2.4.1
Determining the gearbox setting using the calculating disc rule .......................................... 149
8.2.5
Adjusting the fertiliser placement depth ............................................................................... 150
8.2.6
Adjusting the furrow former on the fertiliser coulter ............................................................. 151
8.3
Adjusting the track marker length and working intensity ..................................................... 151
8.3.1
Calculating the track marker length ..................................................................................... 152
8.4
Adjusting the implement wheel mark eradicator .................................................................. 153
8.5
Adjusting the tractor wheel mark eradicator ........................................................................ 154
8.6
Adjusting the pre-emergence marker .................................................................................. 155
8.7
Adjusting fan speed ............................................................................................................. 156
Содержание EDX 9000-TC
Страница 27: ...General Safety Instructions EDX 9000 TC BAH0048 6 09 2019 27 Fig 3 Fig 4...
Страница 212: ...Cleaning maintenance and repairs 212 EDX 9000 TC BAH0048 6 09 2019 Fig 304 Fig 305 Fig 306 Fig 307 Fig 308 Fig 309...
Страница 243: ...Hydraulic diagram EDX 9000 TC BAH0048 6 09 2019 243 Fig 346...
Страница 244: ...Hydraulic diagram 244 EDX 9000 TC BAH0048 6 09 2019...
Страница 245: ...Notes EDX 9000 TC BAH0048 6 09 2019 245 14 Notes Space for your notes...