![Amazone EDX 9000-TC Скачать руководство пользователя страница 160](http://html1.mh-extra.com/html/amazone/edx-9000-tc/edx-9000-tc_operating-manual_2919753160.webp)
Settings
160
EDX 9000-TC BAH0048-6 09.2019
8.7.4
Basic setting (pressure relief valve)
The basic setting depends on the design of the
pressure relief valve.
Round outer contour (Fig. 218/1)
Fig. 221
1. Loosen the lock nut (Fig. 221).
2. Adjust the pressure relief valve to the
factory-set dimension "21 mm" (Fig. 221).
2.1. Turn the bolt with the hexagon socket
wrench (Fig. 221/1) accordingly.
3. Tighten the lock nut.
Fig. 222
Hexagonal outer contour (Fig. 219/1)
Fig. 223
1. Loosen the lock nut (Fig. 224).
2. Using a hexagon socket wrench, screw the
bolt in completely (Fig. 224/1) (clockwise).
3. Using a hexagon socket wrench, unscrew
the bolt back by 3 turns.
4. Tighten the lock nut.
Fig. 224
Содержание EDX 9000-TC
Страница 27: ...General Safety Instructions EDX 9000 TC BAH0048 6 09 2019 27 Fig 3 Fig 4...
Страница 212: ...Cleaning maintenance and repairs 212 EDX 9000 TC BAH0048 6 09 2019 Fig 304 Fig 305 Fig 306 Fig 307 Fig 308 Fig 309...
Страница 243: ...Hydraulic diagram EDX 9000 TC BAH0048 6 09 2019 243 Fig 346...
Страница 244: ...Hydraulic diagram 244 EDX 9000 TC BAH0048 6 09 2019...
Страница 245: ...Notes EDX 9000 TC BAH0048 6 09 2019 245 14 Notes Space for your notes...