
MU-100A
10. Setting of Measurement Mode and Schedule
10-17
3
Select the setting object between “Axis1(0)” (first axis) and “Axis2(1)” (second
axis) to set the schedule number.
4
Set No.1 “Squeeze-Time”, No.2 “Weld-Time”, and No.3 “Hold-Time” to the time
longer than the set time for the welding power supply. Set the weld time to the
time longer than the set time for the welding power supply.
5
Set the monitoring level according to your use conditions.
Monitoring of the before-welding force
No.10 “Before Weld Force LO” (before-welding force lower limit)
No.11 “Before Weld Force UP” (before-welding force upper limit)
Monitoring of the after-welding force
No.12 “After Weld Force LO” (after-welding force lower limit)
No.13 “After Weld Force UP” (after-welding force upper limit)
6
Set the level output according to your use conditions.
Use of the force level output
No.17 “Force Level1”
No.18 “Force Level2”
No.19 “Force Level3”
7
Set the weld start output force value to your use conditions.
Setting of the weld start output force value
No.21 “Tangential Force”
c. Measurement
1
Press MONI key to display the normal screen.
2
Set the schedule by selecting schedule switching signals “SCH1”, “SCH2”,
“SCH4”, “SCH8”, “SCH16”, “SCH32”, and “SCH64” or via the panel.
3
Input “ST-FORCE1” or “ST-FORCE2” (second axis) to make a measurement.
Содержание MU-100A
Страница 1: ...AA04OM1170018 19 OPERATION MANUAL Original instructions HEAD CONTROLLER MU 100A...
Страница 114: ......