
MAWA-300B
6. Timing Chart
6-11
(9)
High-voltage Start (at occurrence of LOST)
The following is a timing chart for the case where an accidental fire occurs at a high-voltage start.
1
When the arc stops in the process of welding
トリガ出力
START入力
READY出力
ガス出力
SYNC.OUT出力
設定時間
プリフロー
約2μs
約30ms
溶接電流
※5
END出力
NG出力
LOST出力
1~200ms ※4
1~200ms ※1
※2
1~200ms ※3
約5ms
アーク切れ
*1 Set value of “START signal input decision delay time.” Refer to “4. (6) Switch Select Screen.”
*2 Welding data creating time (approx. 60 ms for the first condition change or approx. 30 ms for the second or later change).
Refer to “4. (6) Switch Select Screen.”
*3 Set value of “END signal output time.” Refer to “4. (6) Switch Select Screen.”
*4 Set value of “GOOD/NG signal output time.” Refer to “4. (6) Switch Select Screen.”
*5 The LOST signal is turned on concurrently with the ON timing of the END signal. The output is kept, and when the START
signal is received and welding is started, this signal is turned off.
Pre-flow
set time
Arc stop
Approx. 2
μ
s
Approx. 5 ms
START input
READY output
SYNC OUT
output
Gas output
Trigger output
Welding current
END output
NG output
LOST output
Approx.
30 ms
Содержание MAWA-300B-00-00
Страница 1: ...U12OM1190506 01 OPERATION MANUAL PULSETIG WELDING POWER SUPPLY MAWA 300B...
Страница 5: ...MAWA 300B Contents iv 2 1 Monthly maintenance 9 3 2 1 1 Cleaning the cooling fan filter 9 3...
Страница 27: ...MAWA 300B 1 Overview 1 8 3 2 Product dimensions 3 2 1 Main unit Unit mm 3 2 2 Panel unit Unit mm...