
MAWA-300B
6. Timing Chart
6-3
(3)
Touch Start (when the auto mode is set)
Touch start head unit MH-109TA
Footswitch
Input: 1ST
Footswitch
Input: 2ND
Servo head
Start point
Moving
Weld point (main welding)
operation
Middle point
Weld point (initial current)
Initial current start signal
Output: ST1 (= H-ST1)
Main welding start signal
Output: ST2 (= H-ST2)
Operation ready signal
Output: READY (= H-READY)
Gas output start signal
Processing delay (approx. 60ms)
Output: GAS
PULSETIG welding power supply MAWA-300B
(Option I/O for head)
Initial current start signal
Input: H-ST1 (= ST1)
Main welding start signal
Input: H-ST2 (= ST2)
Head ready signal
Input: H-READY (= READY) *1
Gas start signal
Input: GAS
1~200ms settable
Head up start signal
Output: H-HEAD UP
Operation ready signal
Output: M-READY (= READY) *2
End signal
Output: H-END (= END)
PULSETIG welding power supply MAWA-300B
(Welding power supply I/O)
Operation ready signal
User output: READY *2
Processing time of welding result
After-flow
* Arc discharge
Welding current
FST WEL
Initial current Main welding
1~200ms settable
Welding OK signal
Output: GOOD
1~200ms settable
End signal
Output: END (= H-END)
Auto mode supplying the main welding when the head
supplies the initial current to the main welding position from
the initial current position and reaches the main welding
position in the auto mode (when the initial current time is set
to 0 ms)
*1 H-READY is the READY signal for the head controller.
*2 M-READY is the READY signal for
MAWA-300B
. (Refer to “05. READY” in “2.(3)-3-2. User output terminals.”
Содержание MAWA-300B-00-00
Страница 1: ...U12OM1190506 01 OPERATION MANUAL PULSETIG WELDING POWER SUPPLY MAWA 300B...
Страница 5: ...MAWA 300B Contents iv 2 1 Monthly maintenance 9 3 2 1 1 Cleaning the cooling fan filter 9 3...
Страница 27: ...MAWA 300B 1 Overview 1 8 3 2 Product dimensions 3 2 1 Main unit Unit mm 3 2 2 Panel unit Unit mm...