50
62631
Section 5 Service Procedures
To reduce the risk of electric shock, fire, explosion, serious injury or death:
• Disconnect electric power to the dryer(s) before servicing.
• Close gas shut-off valve to gas dryer(s) before servicing.
• Never start the dryer(s) with any guards/panels removed.
• Whenever ground wires are removed during servicing, these ground wires must be
reconnected to ensure that the dryer is properly grounded.
W001R1
WARNING
© Copyright, Alliance Laundry Systems LLC – DO NOT COPY or TRANSMIT
NOTE: Refer to the appropriate wiring diagram
when rewiring the switch.
d. Disengage belt from motor and idler pulleys.
Refer to Figure 28.
e. Remove four screws holding bulkhead to front
flange of cabinet and lift complete bulkhead
assembly out of slots in cabinet. Refer to
Figure 32.
NOTE: During reinstallation of front bulkhead, be
sure that air duct is properly positioned with the
flange inside of the felt seal on the exhaust fan cover.
f. Cylinder Glide – Refer to Figure 33.
(1) Remove two screws holding glide to each
glide bracket.
g. Front Cylinder Seal – Refer to Figure 33.
(1) Pull front cylinder seal from under flanged
edge of bulkhead.
(2) Carefully unhook spring from seal strap.
IMPORTANT: The seal can be adhered to the
bulkhead using 3M-1300 Sealant (obtain locally).
This is accomplished by applying a bead of 3M-1300
Sealant around the entire flanged area where the
felt seal contacts the bulkhead. Strap must be
installed with cupped surface down against the seal
to hold the felt seal more firmly in place on the
bulkhead. Seal must be held securely under strap
and folded under flanged edge around entire
bulkhead.
Figure 31
D402S
EXHAUST HOUSING
ATTACHING SCREWS
Figure 32
DRY858S
AIR
DUCT
CABINET
ATTACHING SCREWS
DRY858S
SLOT
SCREWS
SCREWS