36
62631
Section 5 Service Procedures
To reduce the risk of electric shock, fire, explosion, serious injury or death:
• Disconnect electric power to the dryer(s) before servicing.
• Close gas shut-off valve to gas dryer(s) before servicing.
• Never start the dryer(s) with any guards/panels removed.
• Whenever ground wires are removed during servicing, these ground wires must be
reconnected to ensure that the dryer is properly grounded.
W001R1
WARNING
© Copyright, Alliance Laundry Systems LLC – DO NOT COPY or TRANSMIT
35. LOADING DOOR
Remove four screws holding hinges to door. Refer
to Figure 16.
36. INNER AND OUTER DOOR PANELS AND
DOOR HANDLE
a. Remove four screws holding hinges to door.
Refer to Figure 16.
b. Remove screws holding handle to door and
separate panels. Refer to Figure 17.
IMPORTANT: Do not over-tighten screws when
reinstalling door handle and avoid scratching inner
door panel.
37. DOOR STRIKER
Refer to Figure 17.
a. Remove two screws holding handle to door.
b. Spread door panels just far enough to depress
tabs on top and bottom of striker and push out
of inner panel.
38. DOOR SEAL
Refer to Figure 17.
Open loading door and remove seal from inner
door panel.
NOTE: When replacing seal, be sure seal is not
stretched or distorted. Use a heat resistant adhesive
(such as Krazy Glue
) to adhere door seal to inner
door panel.
Figure 17
DRY850S
DOOR
SEAL
DOOR
STRIKER
HEX HEAD
SCREW
INNER
DOOR PANEL
DOOR
HANDLE
OUTER
DOOR PANEL
DOOR
ASSEMBLY
SPEED
NUT
PHILLIPS HEAD
SCREW
DOOR
HINGE
PHILLIPS HEAD
SCREW