62631
19
Section 4 Grounding
To reduce the risk of electric shock, fire, explosion, serious injury or death:
• Disconnect electric power to the dryer(s) before servicing.
• Close gas shut-off valve to gas dryer(s) before servicing.
• Never start the dryer(s) with any guards/panels removed.
• Whenever ground wires are removed during servicing, these ground wires must be
reconnected to ensure that the dryer is properly grounded.
W001R1
WARNING
© Copyright, Alliance Laundry Systems LLC – DO NOT COPY or TRANSMIT
20. CARD READER MODELS – FROM TERMINAL BLOCK BRACKET TO CABINET TOP, FROM
CABINET TOP TO TIMER AND CABINET TOP TO CONTROL PANEL
Refer to Figure 6
Figure 6
DRY1812S
GROUND
WIRES