440
Appendix H
Ramp Load
Ramp Load
Ramp Loading Mechanism Maintenance
It requires to check a rod of the air cylinder every 10,000 head down action. If it is stained,
clean the rod with cloth and grease the rod.
It requires to check a floating joint of the air cylinder every 50,000 head down action. If it
is stained, clean the rod with cloth and grease the floating joint.
The air cylinder on the ramp loading mechanism has life span due to fatigue and it requires
replacement every 1,000,000 head down action.
Tools Required
•
2.0 mm Hex Key
•
Miniature Driver
•
Diagonal Cutting Plier
•
Silicon Grease
•
Lint Free Cloth
Parts Required
Cleaning Procedure
For details, refer to the E5013A service manual.
Replacement Procedure
For details, refer to the E5013A service manual.
Table 6-65
Parts Number for Air Cylinder
Description
Part Number
Air Cylinder
TBA
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com