5 - TRANSPORT OPERATIONS
4. Line up the top center pin
(1)
with the receiver bracket
(2)
on the top of the tunnel. Line up the lower pins
(3)
with the hooks
(4)
on the sides of the tunnel. Secure
top in place with the retainer pin and clip
(5)
.
RAIL16GEN0120AA
9
RAIL16GEN0151AA
10
5. Lower the boom arm
(1)
down to the top of the tunnel
extension
(2)
and remove the slack in the cable. The
boom must remain in this position for transport.
RAIL16GEN0152AA
11
5-8
Содержание LX1214
Страница 8: ......
Страница 11: ...1 GENERAL INFORMATION Your machine RAIL16SP00177FA 1 Ag Bag silage bagger 1 3 ...
Страница 28: ...2 SAFETY INFORMATION California proposition 65 warning BT09A213 1 2 10 ...
Страница 31: ...2 SAFETY INFORMATION Safety signs and decal locations RAIL16SP00180FA 1 RAIL16SP00181FA 2 2 13 ...
Страница 32: ...2 SAFETY INFORMATION RAIL16SP00182FA 3 RAIL16SP00183FA 4 2 14 ...
Страница 47: ...3 CONTROLS AND INSTRUMENTS Mode on the display will switch to Bag Mode 1 RAIL16GEN0044AA 19 3 9 ...
Страница 94: ...4 OPERATING INSTRUCTIONS 4 10 ...
Страница 158: ...6 WORKING OPERATIONS 6 52 ...
Страница 260: ...7 MAINTENANCE 7 102 ...
Страница 270: ...8 TROUBLESHOOTING 8 10 ...
Страница 272: ...9 SPECIFICATIONS 9 2 ...