6 - WORKING OPERATIONS
3. Remove the bolt
(1)
holding the anchor supports
(2)
with rollers from the tunnel. Save all hardware for re-
assembly.
RAIL16GEN0090AA
52
4. Pull the two anchor cables
(1)
through the pulleys
(2)
under the tunnel floor. Remove the cable retainer pin
(3)
next to the pulley. Save the pin for reassembly.
RAIL16GEN0091AA
53
5. Remove the 9 button head bolts
(1)
(located behind
the clean out plate) securing the tunnel floor
(2)
to
the frame. Save the button head bolts and nuts for
reassembly.
RAIL16GEN0092AA
54
6-20
Содержание LX1214
Страница 8: ......
Страница 11: ...1 GENERAL INFORMATION Your machine RAIL16SP00177FA 1 Ag Bag silage bagger 1 3 ...
Страница 28: ...2 SAFETY INFORMATION California proposition 65 warning BT09A213 1 2 10 ...
Страница 31: ...2 SAFETY INFORMATION Safety signs and decal locations RAIL16SP00180FA 1 RAIL16SP00181FA 2 2 13 ...
Страница 32: ...2 SAFETY INFORMATION RAIL16SP00182FA 3 RAIL16SP00183FA 4 2 14 ...
Страница 47: ...3 CONTROLS AND INSTRUMENTS Mode on the display will switch to Bag Mode 1 RAIL16GEN0044AA 19 3 9 ...
Страница 94: ...4 OPERATING INSTRUCTIONS 4 10 ...
Страница 158: ...6 WORKING OPERATIONS 6 52 ...
Страница 260: ...7 MAINTENANCE 7 102 ...
Страница 270: ...8 TROUBLESHOOTING 8 10 ...
Страница 272: ...9 SPECIFICATIONS 9 2 ...