6 - WORKING OPERATIONS
13. Under the tunnel assemble the 3/4-10 x 3 flange bolts
between the tunnel and the frame. Secure in place
with 3/4-10 nylok nuts. Tighten securely.
RAIL16GEN0091AA
3
RAIL16GEN0093AA
4
14. Place the anchor cables
(1)
around the cable pulleys
(2)
under the tunnel and insert the retainer pin
(3)
next
to the pulley.
RAIL16GEN0091AA
5
15. After the tunnel is in place on the frame insert the
nine button head bolts
(1)
that is used to secure the
tunnel floor
(2)
to the frame. Insert the bolts from the
top down and secure in place with the nuts on the
underside.
RAIL16GEN0092AA
6
6-6
Содержание LX1214
Страница 8: ......
Страница 11: ...1 GENERAL INFORMATION Your machine RAIL16SP00177FA 1 Ag Bag silage bagger 1 3 ...
Страница 28: ...2 SAFETY INFORMATION California proposition 65 warning BT09A213 1 2 10 ...
Страница 31: ...2 SAFETY INFORMATION Safety signs and decal locations RAIL16SP00180FA 1 RAIL16SP00181FA 2 2 13 ...
Страница 32: ...2 SAFETY INFORMATION RAIL16SP00182FA 3 RAIL16SP00183FA 4 2 14 ...
Страница 47: ...3 CONTROLS AND INSTRUMENTS Mode on the display will switch to Bag Mode 1 RAIL16GEN0044AA 19 3 9 ...
Страница 94: ...4 OPERATING INSTRUCTIONS 4 10 ...
Страница 158: ...6 WORKING OPERATIONS 6 52 ...
Страница 260: ...7 MAINTENANCE 7 102 ...
Страница 270: ...8 TROUBLESHOOTING 8 10 ...
Страница 272: ...9 SPECIFICATIONS 9 2 ...