6 - WORKING OPERATIONS
12. Remove the guard
(1)
over the chains at the driven
end of the rotor on the feed table side. This is to ac-
cess the three allen flat head bolts
(2)
(in line with the
rotor) that hold the tunnel to the frame. Remove all
three bolts. Save all hardware for reassembly. Early
production had flat head bolts, current production has
hex head bolts.
RAIL16GEN0097AA
25
RAIL16GEN0096AA
26
13. Identify and remove the two quick disconnect hoses
from the “A”
(1)
& “B”
(2)
ports on the valve block
(3)
mounted to the tunnel on the feed table side just in
front of the cab. The valve and hoses from the “C” &
“D” ports remain with the tunnel. Valve block shown
is on a 12 foot tunnel, valve & hoses are the same as
a 14 foot tunnel, just mounted different.
RAIL16GEN0101AA
27
6-12
Содержание LX1214
Страница 8: ......
Страница 11: ...1 GENERAL INFORMATION Your machine RAIL16SP00177FA 1 Ag Bag silage bagger 1 3 ...
Страница 28: ...2 SAFETY INFORMATION California proposition 65 warning BT09A213 1 2 10 ...
Страница 31: ...2 SAFETY INFORMATION Safety signs and decal locations RAIL16SP00180FA 1 RAIL16SP00181FA 2 2 13 ...
Страница 32: ...2 SAFETY INFORMATION RAIL16SP00182FA 3 RAIL16SP00183FA 4 2 14 ...
Страница 47: ...3 CONTROLS AND INSTRUMENTS Mode on the display will switch to Bag Mode 1 RAIL16GEN0044AA 19 3 9 ...
Страница 94: ...4 OPERATING INSTRUCTIONS 4 10 ...
Страница 158: ...6 WORKING OPERATIONS 6 52 ...
Страница 260: ...7 MAINTENANCE 7 102 ...
Страница 270: ...8 TROUBLESHOOTING 8 10 ...
Страница 272: ...9 SPECIFICATIONS 9 2 ...